Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

Products

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing ApplicationDrum permanent magnetic separato

Send your inquiry

DESCRIPTION

Basic Info
Color Multi Color
Customized Customized
Condition New
Magnetic Pole Permanent Magnet
Magnetic Strength Various
Drum Dia. 600-1800mm
Drum Len. 1800-5000mm
Capacity 15-320t/H
Transport Package Containerized
Specification CTB600-1800
Trademark HZE
Origin China
HS Code 8474100000
Production Capacity 20 Sets/Year
Product Description
Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

 

ApplicationDrum permanent magnetic separators are sorted as following four types:CTBY separator for pre-concentration: suitable for wet type pre-concentrating magnetite before grinding mills after the ore fine crushing to be less than 10mm.CTBC separator for roughing: used as rougher after one stage or multi-stage grinding, or the rougher to recover magnetic minerals from the tailings which are separated out nonferrous metals already. The feed particle size should be less than 4mm.CTBJ separator for cleaning: applied as cleaner to purify the concentrate of roughing after the magnetite ore grinding and classifying. The feed particle size should be less than 2mm.CTBN separator for thickening: used to thicken and separate sands before they are returned into ball mill or thicken and separate magnetite concentrate before filtration. The feed particle size should be less than 4mm.FeaturesLarge magnetic envelope angle design which increases the length of the separation area and the number of magnetic inversions, achieve the effective separation of magnetic materials and non (weak) magnetic materials.Neodymium-iron-boron magnets are used in all magnetic systems to ensure high magnetic field intensity and large depth of action.The demagnetization rate of magnetic field intensity is less than 5% after 8 years.The magnetic system is protected by stainless steel plate to ensure that the magnetic block does not fall off.According to different uses and separation conditions, different types of magnetic separators have different magnetic system design and tank structure.The tank structure is semi-countercurrent. It can also be made into a downstream tank according to sorting conditions and user requirements.The shell of the pulley is made of stainless steel and lined with wear-resistant rubber outside, which has a long service life.The beneficiation indexes of high grade and high recovery can be obtained at the same time.Technical ParametersSmall Size
ModelDrum Dia.(mm)Drum Len.(mm)B of Drum Surface(mT)Capacity(t/h)Power(kw)Speed(rpm)
CTB-6186001800Confirmed according to ore properties15-302.240
CTB-718750180020-35335
CTB-918900180025-40428
CTB-10181050180045-605.522
CTB-10211050210050-705.522
CTB-10241050240060-805.522
CTB-10301050300080-1207`.522

Medium Size
ModelDrum Dia.(mm)Drum Len.(mm)B of Drum Surface(mT)Capacity(t/h)Power(kw)Speed(rpm)
CTB-121812001800Confirmed according to ore properties60-751117
CTB-12241200240080-1101117
CTB-123012003000100-1401117
CTB-123612003600120-1601517
CTB-124012004000130-1701517
CTB-124512004500150-2001517

Big Size
ModelDrum Dia.(mm)Drum Len.(mm)B of Drum Surface(mT)Capacity(t/h)Power(kw)Speed(rpm)
CTB-153015003000According to ore properties100-1801114
CTB-154015004000150-2001514
CTB-154515004500180-24018.514
CTB-155015005000210-28018.514
CTB-182418002400100-1401514
CTB-183018003000140-19018.514
CTB-184018004000200-2603014
CTB-185018005000280-3203714

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing


1. What is the main business scope of your company?
HZE is a company with R&D center, design institute, manufacturing factories, installation and commissioning teams. Our customers are in the mining and mineral processing fields. Our major businesses include mineral processing EPC (engineering, procurement and construction), project consultation, engineering design, mineral processing equipment manufacturing, on-site installation, commissioning, staff training, customer project operation management, spare parts supply and technical support. Customers are free to choose any one or any combination of our services.

2. What are the outstanding advantages of your company?
The one-stop service of mineral processing engineering project and equipment is our core competitiveness.The most important feature that HZE distinguishes itself from other engineering companies, design companies or consulting companies is that we are also an equipment manufacturer with a production plant of 50,000 square meters, and we have complete manufacturing rout and the related equipment.HZE distinguishes itself from other equipment manufacturers by owning its own R&D center and engineering design institute.HZE distinguishes itself from many mining machinery enterprises by possessing an expert team with members including not only senior engineers of the company, but also top Chinese technical experts, university professors and researchers.

3. What are the characteristics of your company's 3D design?
HZE not only uses 3D software to design equipment, but also uses 3D software to design process flow, pipeline, steel structure, auxiliary facilities, etc. of the whole mineral processing project. We even use 3D design for equipment packaging, container packing and equipment instructions manual. This greatly improves the quality of equipment and engineering, shortens the construction period, facilitates technical discussion and evaluation, facilitates project management, improves construction safety and reduces project cost.

4. What are the service features of your company?
  1. Customers who whether buy our equipment, or entrust us with EPC, or require us to provide a certain service, cooperate closely with us to carry out specific operations and supervise our implementation throughout the process.
  2. HZE will try to understand the basic situation and needs of customers as detailed as possible before the sale, formulate a preliminary plan according to the specific situation of customers, and get unanimous opinions after communications and discussions with customers to determine the plan.
  3. We set up customer files for every customer who signed the contract with us and upload them to the Cloud where customers can also get an account and password. Customers can have all the documents, videos and pictures, technology, services, execution, operation, management and control, maintenance and so on related to the business.
  4. Whether it is in the process of general contracting, equipment manufacturing or providing some kind of service, we welcome customers to know about our implementation on the spot or through the network, and put forward requirements and opinions.
  5. We assist users who have used our products to formulate operation specifications and make suggestions on maintenance plans and spare parts inventories. In addition to routine on-site installation, commissioning and training, during the production period after we handing over equipment to customers for use, we often understand the equipment using situations through the network and provide guidance and training to customer management and operators.
  6. For the clients who have just start the mining business, we provide the opportunity of training and practice in China's mines for the clients' employees, until they are skilled in operation and maintenance.

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing

Iron Ore Gangue Rejection Wet Drum Permanent Magnetic Separator for Roughing